Building Materials 48.3mm Scaffolding Pipe ERW Galvanized Low Carbon Steel Pipe

Product DescriptionProduct NameERW/ASTM/Q235 scaffolding/hot dipped galvanized steel pipeOutside Diameter21.3 - 609.6 mmThickness1.6-4.0mmSurfaceHot dipped galvanized, Pre galvanizedStandardBS1139, EN39, EN10219, MS1462EndsPlain ends, Cutting, Threading, Beveled, Flange, etc.ApplicationUrban/civil construction pipe, Machine stru

Featured Products

Product Description

Product NameERW/ASTM/Q235 scaffolding/hot dipped galvanized steel pipe
Outside Diameter21.3 - 609.6 mm
Thickness1.6-4.0mm
SurfaceHot dipped galvanized, Pre galvanized
StandardBS1139, EN39, EN10219, MS1462
EndsPlain ends, Cutting, Threading, Beveled, Flange, etc.
ApplicationUrban/civil construction pipe, Machine structure pipe, Agriculture equipment pipe, Water and gas transport pipe, Greenhouse pipe, Scaffolding pipe, Building material tube, Furniture tube, Low pressure fluid tube, Oil pipe, etc.
Delivery TimeUsually within 10-30 days after receipt of deposit,asap

Detailed Photos

Scaffold tubes, also called scaffolding tubes, is the main component of the scaffolding construction system. Scaffolding tube are widely used as a temporary structure to help workers craw and repair building in height. Also scaffolding tubes are frequently be used in formwork and shoring system. The outside diameter is 48.3mm with thickness 3.2 or 4.0mm. There are different grade of scaffolding tube, such as S235, S355. Our factory has more than 15 years experience in Scaffolding tube, we can produce EN39, EN10219, BS1139 and JIS3444 standard tube. All are produced strictly according to the standard. Usually the surface is hot dipped galvanized with zinc coating above 210g/m2, which offers long term corrosion resistance.

Building Material 48.3mm Scaffolding Pipe ERW Galvanized Mild Steel Tube
Building Material 48.3mm Scaffolding Pipe ERW Galvanized Mild Steel Tube
Building Material 48.3mm Scaffolding Pipe ERW Galvanized Mild Steel Tube
 
Building Material 48.3mm Scaffolding Pipe ERW Galvanized Mild Steel Tube
Building Material 48.3mm Scaffolding Pipe ERW Galvanized Mild Steel Tube
Building Material 48.3mm Scaffolding Pipe ERW Galvanized Mild Steel Tube
 

 

Detailed Images

 

Building Material 48.3mm Scaffolding Pipe ERW Galvanized Mild Steel Tube
Building Material 48.3mm Scaffolding Pipe ERW Galvanized Mild Steel Tube

Plain Ends without Burrs

All tubes and pies are plain ends, and we have clean ends machines to remove burrs in-line production. Friend steel pipes not only concentrate on the sizes and surface, but also pay attention on the details, which make our pipes are different from others. Any factories can produce pipes and tubes, but not all can provide high quality products.

Packaging & Shipping

Building Material 48.3mm Scaffolding Pipe ERW Galvanized Mild Steel Tube
Building Material 48.3mm Scaffolding Pipe ERW Galvanized Mild Steel Tube
 

1.Packing in bundle with steel strips;
2.With seaworthy package at the end;
3.Covered with plastic sheet;
4.Could be done with your requirement

Company Profile

Building Material 48.3mm Scaffolding Pipe ERW Galvanized Mild Steel Tube

Our Advantages


1. Have a professional quality control team, can provide ISO certificate and support third party testing.

2. More than 15 years of professional export experience.

3. As a professional manufacturer, you get the best price and fast delivery time.

4. Samples are available free of charge
 

FAQ

1. Q: What's your MOQ(minimum order quantity)?
A: One full 20ft container,mixed acceptable .


2. Q: What's your packing methods?
A: Packed in bundle or bulk (customed is accepted).


3. Q: What's your delivery time?
A: 10-20 days after received the advance payment .


4. Q: Are you manufacturer or trader?
A: We are a professional steel product manufacturer with more than 15 years of export experience.

5. Q: Where's your factory?
A: Our factory is in Tianjin city (near Beijing), close to Tianjin Port

6. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.

7. Q: Can you supply other scaffolding materials?
A: Yes. All related construction materials.

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours