Carbon steel pipe fittings reducer butt welding seamless carbon steel pipe fittings Con reducer eccentric reducer

NameStainless/Carbon Steel Eccentric ReducerTypeSeamless reducer; Welded reducer; Concentric reducer; Eccentric reducer; butt welding reducer; forged reducer; forging reducer; welding reducerFormingPress FormingSurface finishShot blasting, Sand blasting or Pickling surfacep;Black painting, varnish paint, anti rust oil, hot galva

Featured Products

Carbon Steel Pipe Fitting Reducer Butt-Welded Seamless Carbon Steel Pipe Fittings Con Reducer Eccentric Reducer
NameStainless/Carbon Steel Eccentric Reducer
TypeSeamless reducer; Welded reducer; Concentric reducer; Eccentric reducer; butt welding reducer; forged reducer; forging reducer; welding reducer
FormingPress Forming
Surface finishShot blasting, Sand blasting or Pickling surfacep;Black painting, varnish paint, anti rust oil, hot galvanized, cold galvanized, 3PE, etc.
StandardASME/ANSI B16.9, JIS B2311/2312/2313, DIN2605/2615/2616/2617, EN10253, MSS SP-43/75,ASME B16.9-2007,ANSI/ASME B16.11,ASME B16.25-2007,ASME B16.5-2007,EN10253-1-1999 EN10253-2-2007 EN10253-3-2008 EN10253-4-2008,DIN2605-1-1992 DIN2605-2-1995, JIS B2311-2009 JIS B2312-2009 JIS B2313-2009, GB/T12459-2005 GB/T13401-2005 GB/T10752-2005, SH/T3408-1996 SH/T3409-1996, SY/T0609-2006 SY/T0518-2002 SY/T0510-1998, DL/T695-1999 GD2000 GD87-1101, HG/T21635-1987 HG/T21631-1990, MSS SP-43, MSS SP-95, MSS SP-75, MSS SP-79;ISO 3419,ISO 5251,DIN 2616
MaterialCarbon  steel: ASTM A234 WPB,ASTM A420 WPL6, WPL3;ASTM A105 WPB;ASTM A106;ASTM A350 LF2,
DIN St37, St45.8, St52.4,St.35.8,St.35.8,ASTM A333 GR.6,ASTM A860 WPHY 70, WPHY 65, WPHY 60, WPHY 52,WPHY 46,WPHY 42,API 5L GRB, X60, X65, X42,X52
Stainless steel: ASTM A403 WP304, A403 WP304L, A403 WP316, A403 WP316L, A403 WP321,ASTM A182 F 304, 304L,316, 316L,904L
Alloy steel: ASTM A234 WP12, A234 WP11, A234 WP22, A234 WP5, A234 WP9,A420 WPL8, A420 WPL9
ASTM A335 P5, P9, P11, P12, P22, P91,ASTM A213,ASTM A182 F5,F11,F22,F91
SizeSeamless DN15 (1/2") - DN600 (24")
Welded DN15(1/2") - DN1200 (48")
WT  SCH5S-SCH160
PackingWooden cases, pallets, nylon bags or according to the customers' requirements
MOQ10  pieces 
TechnicalWelded, forged
Delivery time7-35 days after your advance payment
Advantages1. Reasonable price with excellent quality
2. Abundant stock and prompt delivery
3. Rich supply and export experience, sincere service
4. Reliable forwarder, 2-hour away from port
Carbon Steel Pipe Fitting Reducer Butt-Welded Seamless Carbon Steel Pipe Fittings Con Reducer Eccentric ReducerCarbon Steel Pipe Fitting Reducer Butt-Welded Seamless Carbon Steel Pipe Fittings Con Reducer Eccentric ReducerCarbon Steel Pipe Fitting Reducer Butt-Welded Seamless Carbon Steel Pipe Fittings Con Reducer Eccentric ReducerCarbon Steel Pipe Fitting Reducer Butt-Welded Seamless Carbon Steel Pipe Fittings Con Reducer Eccentric ReducerCarbon Steel Pipe Fitting Reducer Butt-Welded Seamless Carbon Steel Pipe Fittings Con Reducer Eccentric ReducerCarbon Steel Pipe Fitting Reducer Butt-Welded Seamless Carbon Steel Pipe Fittings Con Reducer Eccentric Reducer

FAQ

1. Are you a factory or trading company?
We are a factory.we also have cooperated factory doing other steel business.

2. How can I get a quotation from you ?
You can leave us message, and we will reply every message in time. Or we may talk on line by Trademanager.
And you can also find our contact information on contact page.

3.Can I get samples before order ?
Yes, of course. Usually our samples are free. we can produce by your samples or technical drawings. 

4. what is your delivery time ?
The time of delivery is usually around 20 days(1*20FT as usual).
We can send out in 2 days, if it has stock.

5.What is your payment terms?
Our usual payment term is 30% deposite, and rest against B/L. L/C is also acceptatble.EXW,FOB,CFR,CIF,DDU.

6.How does your factory do regarding quality control?
Quality is priority. Our factory has gained ISO9001 authentication. We guarantee the goods out from our factory 100% qualified.
And Each Process, we have very strict operation and arrange 2 techinians to inspect. After the products are finished,
we will make the last test to pick up the unqualified products

7.What is your MOQ?
As long as hold one container ,we can accpet the order.

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours